SERVICES
   Geotechnical Reports
   Planing/ design and tender preparation
   Project support during tendering
   Implemantation planning and static calculation
   Consulting for site management and logistic
   Consulting geotechnics
   Supervision / inspection
   Surveying
   Legal consultancy
   Claim management
   Expert / evaluator / arbitration
   Consulting
   Projects and Subcontracts
   Constructors
   Hyperbaric Tunnel Construction and Diving
   Sealing / Grouting
Searchresults sorted by 
offer   Item online since: 02-03-2016  
Dew Point Meter
Dew Point Meter Portable Dew Point Meter is designed to measure the performance of drying systems for air, nitrogen and other compressed gases. This Portable Dew Point Meter Model is ideal for monitoring ...
more

offer   Item online since: 21-10-2014  
Work in Compressed Air deeper 3.6bar
Work in Compressed Air deeper 3.6bar NST-DruckLV-NST Decompression with Oxygen under normal conditions Work pressure between 0.7 and 1.5bar (officially 3.6bar) Experience: More than 230.000 hrs. NST-AIR/OXY/12M-NST Decompression with Oxygen without compromises Work pressure between 1.5 and 6.0bar Experience: More than 51.232 hrs. NST-Canadian ...
more

offer new   Item online since: 09-10-2014  
Compressed Air Work
Compressed Air Work Below a depth of 40 metres (which equals 4.0bar over pressure) compressed air technicians enter a zone where it is no longer effective to carry out compressed air work under ...
more

offer used   Item online since: 14-08-2012 on request 
Microtunneling Equipment from Herrenknecht and Iseki
Microtunneling Equipment from Herrenknecht and Iseki Wide range of Microtunneling Equipment for sale. The equioment is in need condition and ready for work. Please contact us for more details and list of equipment: TBM Trading Middle East FZC Jim ...
more

offer   Item online since: 11-03-2011  
Monitoring Points / Cross Profiles
Monitoring Points / Cross Profiles At the establishment of surface networks many control points have to be marked reliably in soft ground. A reliable possibility is our cross profile made of corrosion proved aluminium alloy. ...
more

 [1]  2  3  4  5  6  7 
Company links

DMT GYROMAT 3000
The latest and most accurate precision - surveying gyroscope for tunnel surveying in the world...
more...

Costs & Time
Construction Costs Construction Time Contracts and Claim Management Economic Comparison Studies Expert reports
www.hehenberger.net

Compressed Air Work
Hyperbaric Tunnel Construction and Diving, with Compressed Air Technicians, Professional Divers and Supervisors
www.nordseetaucher.de

Engineering consult. IBE
Evaluation, planning, survey of sealing and injection measures.
http://www.i-b-e.de

Welding of PE pipes
We weld polyethylene pipes in all sizes with modern equipment. We work fast and reliably!
www.anastasia-don.ru




Here your advert could appeare soon!